Power BI & MCP Engineering

Power BI Consulting & AI-Accelerated Development

Enterprise semantic modeling, DAX optimization, and next-generation Power BI MCP automation.

Most Power BI implementations struggle with slow DAX measures, conflicting metrics across reports, and weeks of manual visual formatting. We combine deep enterprise Power BI consulting: star-schema architecture, row-level security, and PBIR/TMDL governance: with our proprietary SimBI & Power BI MCP compiler to deliver governed dashboards in a fraction of the time.

What we deliver

Star-schema modeling & DAX optimization

Eliminate slow visuals and conflicting metrics by refactoring flat tables and brittle calculated columns into clean star schemas and optimized DAX measures.

Power BI MCP & Cursor AI workflow automation

Use Model Context Protocol (MCP) in Cursor or VS Code with our SimBI compiler to go from reference images or YAML specs to live Power BI dashboards in under 10 minutes.

PBIR, TMDL & Git-based BI governance

Modernize your Power BI development lifecycle with human-readable PBIR project files, version control, automated diffing, and deployment pipelines.

Row-level security (RLS) & workspace governance

Enterprise security architecture ensuring different executives, regions, or external clients see only their authorized slice of a single master dataset.

Dataflow, Fabric & Power Query M engineering

Push heavy transformations upstream into SQL, Snowflake, Microsoft Fabric, or reusable Dataflows for fast, reliable scheduled refreshes.

Team enablement & semantic handover

We train your internal analysts on star-schema best practices, DAX patterns, and AI-assisted MCP workflows so your team stays self-sufficient.

Production Examples

Featured Dashboards & Case Studies

Real production deliverables engineered for global financial regulators, institutional risk teams, and capital markets organizations.

SimBI & Power BI MCP • Video Walkthrough< 10 Min Build
Reference Image to Power BI Dashboard in Under 10 Mins

Reference Image to Power BI Dashboard in Under 10 Mins

Watch how we pair Microsoft's Power BI Modeling MCP in Cursor with SimBI to build a complete 3-page Risk Control Power BI dashboard from a reference image.

Who this is for

  • Organizations standardized on Microsoft 365, Azure, or Fabric seeking high-ROI executive Power BI dashboards
  • BI teams battling slow report load times, DAX circular dependencies, or conflicting metric numbers across departments
  • Analytics engineers adopting Power BI MCP in Cursor or VS Code for code-first, version-controlled BI automation
  • Regulated enterprises requiring strict Row-Level Security (RLS), auditability, and certified semantic models
  • Finance and risk teams migrating manual Excel reporting packs into live, drillable Power BI workspaces

Why Data Sense

Pioneers in Power BI MCP & declarative BI

We build the open-source and enterprise tooling (SimBI) that compiles declarative YAML into native Power BI PBIR projects alongside Microsoft's MCP server.

We fix the semantic model, not just the visuals

Slow reports and conflicting numbers are data modeling problems. We engineer rock-solid star schemas and verified DAX measure libraries.

Executive clarity over visual clutter

Every Power BI report we deliver follows strict visual hierarchy and financial design patterns so leadership trusts and uses it daily.

Common Questions

Frequently Asked Questions

What causes Power BI conflicting metrics across reports, and how do you fix it?

Conflicting metrics in Power BI almost always happen when business logic is duplicated across multiple PBIX files, calculated columns mix grains, or implicit filters behave differently across visuals. We resolve this by centralizing DAX measures in a single governed semantic model (and optionally enforcing deterministic definitions via SimBI ADI) so every report queries the exact same calculation logic.

How does Power BI MCP work with Cursor and SimBI for dashboard automation?

Microsoft's Power BI Modeling MCP server allows AI agents in IDEs like Cursor to create tables, relationships, and DAX measures in the semantic model. We pair that with SimBI, our declarative layout compiler, to generate pixel-aligned PBIR visual layouts from a reference image or YAML spec: building multi-page production dashboards in under 10 minutes.

Why are our Power BI reports slow and how can you optimize them?

Slow Power BI reports typically stem from wide flat tables, bi-directional relationships, iterator DAX functions running over millions of rows, or complex Power Query transformations blocking refresh. We refactor your model into a clean star schema, push transformations upstream, and rewrite DAX measures for the VertiPaq engine.

Can you integrate Power BI with Snowflake, BigQuery, SQL Server, or Excel pipelines?

Yes. We configure optimized Import, DirectQuery, or Composite models connected to Snowflake, BigQuery, Azure Synapse, SQL Server, PostgreSQL, and automated Python/Excel data pipelines, complete with on-premises or VNet data gateways and Row-Level Security (RLS).

Ready to talk?

Tell us about your data challenge and we'll show you exactly how we'd approach it. No obligation.

Get a Free Consultation →